Maryland State Highway Administration Testimonial

October 24, 2012 |

Rampart has a hydrodemolition system that is ideal with the changing environmental requirements.  They are proof that when environmental agencies require 100% containment during the hydrodemolition operation, it can be achieved.  We never shut down because they could not contain the waste water.

Rampart used a process called ‘Dry-Hydro’, this process collects the hydrodemolition waste water at the cutting head.

Categorized as: Announcements; ;