Maryland State Highway Administration Testimonial

Oct 24, 2012 in Announcements

Rampart has a hydrodemolition system that is ideal with the changing environmental requirements.  They are proof that when environmental agencies require 100% containment during the hydrodemolition operation, it can be achieved.  We never shut down because they could not contain the waste water.

Rampart used a process called ‘Dry-Hydro’, this process collects the hydrodemolition waste water at the cutting head.